Case study · Completed November 2025
Staged cooling tower refurbishment: completing all 5 towers
A staged cooling tower refurbishment let a site with 5 cooling towers have all of them refurbished, without taking the whole cost in one year. We refurbished the first 3 over previous years, then completed the final 2 with new fill, drift eliminators, fan blades, fan hubs and drive belts.

The challenge
The site runs 5 induced draft cooling towers, and all of them were due for refurbishment. Doing every tower at once would have meant a large one-off cost.
To spread that cost, the work was staged over several years. Each stage had to bring its towers back to full condition so the set stayed reliable while the rest waited their turn.

The staged cooling tower refurbishment
We refurbished the first 3 towers in earlier stages. For this final stage we completed the remaining 2:
- Replaced the fill media.
- Replaced the drift eliminators.
- Fitted new fan blades and fan hubs.
- Installed new drive belts.


The result
- All 5 towers now refurbished, with the final 2 completed in November 2025.
- The cost spread across several years and maintenance budgets, not taken in one hit.
- Each tower fitted with new fill, drift eliminators, fan components and belts.

At a glance
Scope
Final 2 of 5 cooling towers
Approach
Staged over several years
Works
Fill, drift eliminators, fan blades and hubs, drive belts
Completed
November 2025
Services used
Cooling tower servicing and refurbishment
Commercial HVAC and facilities
Several towers, one budget?