Our Projects

Water treatment case studies: a selection of recent Eureka Water & Filtration projects for mines, industrial plants and commercial facilities, with the scope and result of each.

Eureka Mobile Pure Water container in front of a storage tank

July 2026

Rapid drawdown and molybdenum removal

  • Project scope: Treatment and discharge of 12.8 ML of contaminated water from a thermal energy storage tank, then removal of the sludge left on the tank floor.
  • Result: Molybdenum treated to below the 10 mg/L trade waste limit and discharged in 31 days, with the tank handed back empty.

Read the case study

Standby ion exchange vessels on a skid

Ongoing

Emergency water supply for a mine power station

  • Project scope: Standby ion exchange vessels set up on site to keep demineralised water available to the power station.
  • Result: Demineralised water on hand to prevent downtime if the main supply is interrupted.

Read the case study

Replacement plates for a plate heat exchanger

July 2026

Heat exchanger rebuilds

  • Project scope: Replacement plates and gaskets sourced and freighted to a mine site, with expert supervision of two heat exchanger rebuilds.
  • Result: Both heat exchangers have operated with no issues since.

Read the case study

Eureka ultrafiltration modules installed in an existing plant at a client site

Nov 2025

Ultrafiltration membrane replacement at a refinery

  • Project scope: 18 Eureka UF modules, interchangeable with the original OEM modules, supplied as pre-treatment ahead of reverse osmosis.
  • Result: A cost-effective replacement in high-solids, high-scaling water that protects downstream equipment.

Read the case study

Induced draft cooling towers on a raised steel platform

Jan 2026

Remote cooling tower rebuild

  • Project scope: Full refurbishment of a cooling tower at a remote site, including new fill, drift eliminators, nozzles, fan, motor, belts and a custom top grate.
  • Result: Airflow testing showed the tower back to peak operation.

Read the case study

Containerised cooling tower during a rebuild

Dec 2025

Portable cooling tower fleet rebuild: 8 units in one month

  • Project scope: New fill and drift eliminators for 8 portable cooling towers, plus drives, motors, fan housings and new top grates once extra wear was found.
  • Result: All 8 units rebuilt and back in service within the strict one-month timeline.

Read the case study

Row of industrial cooling towers

Nov 2025

Staged cooling tower refurbishment: all 5 towers

  • Project scope: Final 2 of 5 cooling towers refurbished with new fill, drift eliminators, fan blades, fan hubs and drive belts.
  • Result: All 5 towers now refurbished, with the cost spread over several years.

Read the case study

Stack of custom filter press cloths with centre feed holes and tie straps

Ongoing

Custom process filter cloths for a refinery

  • Project scope: Two custom process filter cloths made to suit the refinery’s filters, supplied on a periodic basis.
  • Result: An ongoing supply of replacement cloths matched to the existing equipment.

Read the case study

Have a job like these?

Tell us about your site, your water or your equipment, and our team will scope it.